Our Standard of Quality
Our Mission
As set forth by our founder, Tomco Electric takes pride in the fact that there is no project we have been involved with that was not executed with the highest quality of workmanship in mind.
Lime Wind Energy Project
The Lime Wind Energy Project consists of six wind turbine generators, each measuring about 198 feet from ground to tip of the blade. The Lime Wind project generates approximately 3MW of power that will be distributed to Idaho Power Company, enough to power about 800 homes. The project is located about 5 miles north of Hunnington, OR in Baker County. The project construction costs were approximately $7 million with about $500,000.00 associated with the electrical installation.
The Lime Wind Energy Project is a very successful project for Tomco in terms of successful completion, on time, within budget and SAFE!